Atrium project
Overall construction progress 51%:
- Pouring concrete poles on 8th floor completed
- Making steel frame for the rooftop
- Laying brick wall on the 6th floor
- Plastering on the 4th floor
- Tiling bathrooms on the 3rd floor
- Installing electric wiring and drains on 5th floor