Construction progress of Atrium project by New Nordic - 13th September 2017
Atrium project
Overall construction progress 55%:
- Pouring concrete poles for the roof completed
- Laying brick wall on the 6th floor
- Plastering on the 4th floor
- Tiling bathrooms on the 4th floor
- Installing electric wiring and drains on 5th floor
- Preparing for the ceiling on 3rd floor